Furring and Cladding

Furring and instillation of the siding has begun.

The furring for the tower and thermally modified wood that runs vertically was changed to allow a drainage plain behind the wood. Furring strips were needed to run vertically to allow water to escape the cavity, and then furring runs horizontally to allow vertical cladding attachment.

Social media & sharing icons powered by UltimatelySocial